A two storey extension built using modular construction. ABA’s design team were responsible for:
- The foundations and substructure for the new building.
- The structure of the link between the two buildings.
- The single storey, steel framed extension required to remodel the existing entrance to the school.
Client
St Giles & St George Academy
Contractor
Seddon Construction Ltd
Structural Engineer
ABA Consulting