• This new facility provides a brand new space for the Sixth form pupils which is part of the Spencer Academy Trust.
• A steel framed split level two storey extension to an existing building with refurbishment to the existing building.
• Piled foundations were required to mitigate the deep made ground.
• Construction period needed to allow for building on site during term time
Client
Spencer Academy Trust
Architect
Thinking Buildings
Structural Engineer
ABA Consulting
